RWD reward minerals ltd

just a meeting place for lunch ? from the website: * Level two...

  1. 1,213 Posts.
    lightbulb Created with Sketch. 28
    just a meeting place for lunch ?

    from the website:

    * Level two flora and fauna surveys initiated in 2013 to underpin environmental submissions for the Project to federal and state authorities (EPA and DoEE) in 2016
    * Resource definition drilling and trench test work during 2015-2016 culminating in the JORC compliant  resource upgrade to 596Mt in-situ SOP

    * AMEC scoping study for the processing plant completed in 2015 and incorporated in the company’s Project scoping study
    * Pilot Pond construction activities in 2016 for pond seepage and geotechnical evaluations on lake Disappointment to establish build methodologies for causeways and pond infrastructure
    * First round evaporation pond and brine trench layout design by independent engineers Knight Piesold in 2016
    * Collation of civil contractor submissions for construction packages of Project infrastructure – Talawana Upgrade, Airstrip and Bulk earthworks for Village and Operations centre in 2016 and Pond construction and Harvesting (Q1 2017)
    * Lycopodium Engineering scoping study for the revised processing plant design completed in 2016 leading into whole of Project feasibility studies in 2017
    * Preliminary numerical hydrogeological models developed for the total project Q1 2017 by Strategic Water Management


    &

    In 2017, the company is progressing its environmental submissions as well as its Feasibility Studies to definitive status for development.
    * Ongoing environmental studies to support the environmental submission approval processes
    (ongoing is surely an apt description ..... they have been at it for 4 years as acknowledged above)
    * Updated review of the brine processing infrastructure (ponds through to plant) and Definitive Feasibility Study for the whole of Project by Lycopodium Engineers


    No news from a number of these promised milestones & apparently our Definitive Feasibility Study is now a Pre Feasibility Study.

    I think I have figured it out ......  the Doc is treating this like another PHD .....  the joy is in the theorising, research & refining of a concept, but the actual producing the final submission is the killer.



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.3¢
Change
0.000(0.00%)
Mkt cap ! $11.70M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 10000 4.2¢
 

Sellers (Offers)

Price($) Vol. No.
4.3¢ 5710 1
View Market Depth
Last trade - 16.21pm 15/09/2025 (20 minute delay) ?
RWD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.