dfonze
There arent any plant delays. ESI has had a change in strategy since the Vietnamese came on board. Prior to this, ESI was going to build a 150K tonne plant and all the preliminary work had been done and everything was ready to go...but since then the plan is to contruct a 2m tonne plant (8 times larger than the initial one), so back to the drawing board. I expect contruction to commence later this year/early next year...but the wait will definitely be worth it.
Dont be surprised if the Indonesian plant is built before the Latrobe Valley one.
- Forums
- ASX - By Stock
- ECT
- share placement plan
share placement plan, page-7
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add ECT (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.343M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $1 | 406 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
65 | 34296227 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 13986530 | 33 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
64 | 33996227 | 0.002 |
28 | 37002532 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 9825223 | 32 |
0.004 | 7713019 | 12 |
0.005 | 3676859 | 23 |
0.006 | 3178567 | 7 |
0.007 | 918333 | 2 |
Last trade - 13.39pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
ECT (ASX) Chart |