Production rate at end of Q1 was "in excess of 4,300", so I don't know how it will be 3,700 for Q2. The production downtimes were resolved in a week, though carried over at quarter end.
Also a coil cleanout should've added +100 boepd. A little bit more waterflood work was done as well.
I am also predicting they low-balled.
- Forums
- ASX - By Stock
- Share Price Catalysts
Production rate at end of Q1 was "in excess of 4,300", so I...
-
- There are more pages in this discussion • 298 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CE1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.571M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CE1 (ASX) Chart |
Day chart unavailable