1MC 3.23% 3.0¢ morella corporation limited

Can I be super lazy and ask what the DFS for stage 2 stated for...

  1. 3,740 Posts.
    lightbulb Created with Sketch. 106
    Can I be super lazy and ask what the DFS for stage 2 stated for construction and commissioning costs? At this early stage and with Primero’s input it looks possible that stage 1 might be good for significantly more output than the 220,000tpa nameplate. Might stage 2 be similarly higher performing than predicted, indeed you’d expect that with all the lessons learned from commissioning and optimising stage 1 that stage 2 should be cheaper, quicker and with fewer hiccups?

    I still wonder if the better long term strategy is to run slowly and near profit/cost neutral to avoid burning through the ore body at low spodumene prices and only deliver stage 2 when the spod price recovers for the expected demand surge from all those gigafactories coming online.
 
watchlist Created with Sketch. Add 1MC (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $8.123M
Open High Low Value Volume
2.8¢ 3.1¢ 2.8¢ $1.312K 44.77K

Buyers (Bids)

No. Vol. Price($)
3 47762 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 10583 1
View Market Depth
Last trade - 15.41pm 04/10/2024 (20 minute delay) ?
1MC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.