RHK 1.83% 80.5¢ red hawk mining limited

Shareholder oppression, page-2

  1. xax
    117 Posts.
    lightbulb Created with Sketch. 409

    Looks like a proposed start up date of 2020 (see below) for BBIG who we were told by our board "aspire" to have our PIOP ore, I wonder what ASIC will make of all this???


    DEPARTMENT OF JOBS, TOURISM, SCIENCE AND INNOVATION 2018 

    The Balla Balla Infrastructure project proposes to construct and operate a 165km railway connecting the Flinders Mines Ltd’s Pilbara Iron Ore Project, located in the central Pilbara Expenditure: $5.6b. Employment: Construction: 3300; Operation: 900 


    DEPARTMENT OF INFRASTRUCTURE, REGIONAL DEVELOPMENT AND CITIES 2018

    This proposed integrated port-rail-mine project will initially connect the Pilbara Iron Ore Project (PIOP) iron ore deposits via a 20 km conveyor and 162 km heavy haulage rail line to the Balla Balla port facility for export. The expected development cost is $5.6b, comprised of $2.4b for the PIOP mine, $1.4b for the port and $1.8b for the railway. project timeframe, short 0-5 years.


    DEPARTMENT OF JOBS, TOURISM, SCIENCE AND INNOVATION November 2018

    https://hotcopper.com.au/data/attachments/1372/1372061-7b6b328f20bd90d3f65a1a83b3065ba5.jpg

 
watchlist Created with Sketch. Add RHK (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.