I think these wells have the potential of being sub 30 days even with the increased length. The last one didn't do well compared to Maverick, I expect most of that gap will be addressed.
An extra 2,000 meters at 50 m/hr would only be two extra days even with additional casing/cementing/hole prep. If they're what they talk themselves up as this should be doable.
- Forums
- ASX - By Stock
- TBN
- Shenandoah South 2 Drilling
Shenandoah South 2 Drilling, page-5
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBN (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $360.5M |
Open | High | Low | Value | Volume |
17.5¢ | 17.5¢ | 17.0¢ | $204.5K | 1.176M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 49909 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 116000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49909 | 0.175 |
4 | 205577 | 0.170 |
2 | 541559 | 0.165 |
7 | 344357 | 0.160 |
1 | 193548 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 116000 | 2 |
0.185 | 1029877 | 7 |
0.190 | 124101 | 5 |
0.195 | 237851 | 7 |
0.200 | 204005 | 2 |
Last trade - 16.10pm 12/08/2024 (20 minute delay) ? |
Featured News
TBN (ASX) Chart |