I think these wells have the potential of being sub 30 days even with the increased length. The last one didn't do well compared to Maverick, I expect most of that gap will be addressed.
An extra 2,000 meters at 50 m/hr would only be two extra days even with additional casing/cementing/hole prep. If they're what they talk themselves up as this should be doable.
- Forums
- ASX - By Stock
- Shenandoah South 2 Drilling
I think these wells have the potential of being sub 30 days even...
-
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $251.1M |
Open | High | Low | Value | Volume |
14.0¢ | 14.0¢ | 13.5¢ | $54.80K | 391.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6337 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 73870 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6337 | 0.135 |
6 | 131476 | 0.130 |
8 | 382164 | 0.125 |
11 | 688666 | 0.120 |
2 | 101739 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 73870 | 1 |
0.145 | 188685 | 4 |
0.150 | 1403436 | 5 |
0.155 | 196203 | 4 |
0.160 | 271716 | 2 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
TBN (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online