COE 4.35% 22.0¢ cooper energy limited

sheringa 1, page-4

  1. 256 Posts.
    In the nearby Silversands-1 oil discovery (Sheringa approx 2.5km South),

    "An open-hole production test over the interval 1354 - 1358.3 metres in the secondary objective Namur Formation flowed at an estimated rate of 860 barrels of
    oil per day and 340 barrels of water per day."

    And from the Christies-5 oil well (Sheringa approx 3km SE),

    "Ran electric logs. Ran DST-1 across the interval 1,626m to 1,636m in the Birkhead Formation, resulting in a flow of 85 bbl/d of oil and 80 bbl/day of water
    through a ¼” choke. DST-2 was run across the interval 1,377m to 1,382.5m in the Mid Namur reservoir, resulting in a flow of 318 bbl/d of oil and 851 bbl/d of water."

    Pulse.
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
-0.010(4.35%)
Mkt cap ! $580.8M
Open High Low Value Volume
22.5¢ 23.0¢ 22.0¢ $4.275M 19.34M

Buyers (Bids)

No. Vol. Price($)
6 196480 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 644396 7
View Market Depth
Last trade - 16.10pm 26/06/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.