MAY 6.06% 3.5¢ melbana energy limited

From the Sherritt Q3 resultsDrilling on Block 10 resumed on...

  1. 365 Posts.
    lightbulb Created with Sketch. 74
    From the Sherritt Q3 results
    Drilling on Block 10 resumed on October 19 following the import of drilling mud tanks due to the lack of availability in Cuba. Sherritt anticipates drilling to a total depth of approximately 5,700 meters. The well will then be completed and tested. As of October 29, drilling to a depth of 5,525 meters had been completed.


 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.5¢
Change
0.002(6.06%)
Mkt cap ! $117.9M
Open High Low Value Volume
3.3¢ 3.6¢ 3.3¢ $577.5K 16.92M

Buyers (Bids)

No. Vol. Price($)
5 1018559 3.4¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 1521853 6
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.