Ship crashes into Baltimore Bridge, page-136

  1. 3,805 Posts.
    lightbulb Created with Sketch. 188
    Well, they were on the job, removing steel, five days after the incident.
    Have 9 barges, and five cranes on site.
    Will have a reduced size ship channel open, by the end of April, with the main one open at the end of May.
    I call that pretty impressive, on logistics and planned execution.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.