Well, they were on the job, removing steel, five days after the incident.
Have 9 barges, and five cranes on site.
Will have a reduced size ship channel open, by the end of April, with the main one open at the end of May.
I call that pretty impressive, on logistics and planned execution.
- Forums
- Breaking News
- Ship crashes into Baltimore Bridge