... This is well known. They had 1.8mt-2mt of DSO stockpiled, which was mined over the last 6 months + and not shipped (as the rail/port didnt work). This is currently whats being shipped at such a fast rate. This proves the rail/port loading logistics works, but doesn't do anything for the magnetite concentrator being proved.
Basically, its up to the magneite concentrator to work to sustain this level of production.
We will only mine/ship 2-3mtpa of DSO. So once the stockpiles runs out we need magnetite to supplement the current shipping rate.
- Forums
- ASX - By Stock
- shipping rate increases
... This is well known. They had 1.8mt-2mt of DSO stockpiled,...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated