ADO 0.00% 2.1¢ anteotech ltd

Shooting the breeze on ADO, page-4484

  1. 1,617 Posts.
    lightbulb Created with Sketch. 347
    I truly think that everything depends on ability to provide required product availability to collaborators/customers. So the quicker we get our manufacturing capabilities in place the better. Then orders will come and contracts will be signed. So how long before production facilities up and running?
 
watchlist Created with Sketch. Add ADO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.