Lol
thats actually not bad if its labour and material included.
I am aware of linear meter although I usually get a full quote for the job and compare it to another quote rather than LM.
Because things usually pop up during work and I dont allow exclusions so they have to quote the whole job.
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 01 Mar
Lolthats actually not bad if its labour and material included.I...
-
- There are more pages in this discussion • 75 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)