GCX Closed 52 week high 6.5 cents. update announcement today.
Hint Based on visuals we think we will drill more holes.
Highlights:
• 17 drillholes have been completed at the Dante copper, gold and platinum group element (“PGE”) project
for a total of approximately 3,600 metres as part of the maiden reverse circulation (“RC”) drill program.
• All 17 completed holes have been despatched to the laboratory for assay. Approximately 30 more RC
drillholes are planned across the 4 priority prospects.
• Based on initial visual observations, the drill program has now been expanded from a planned 30 drillholes
to approximately 47 drillholes.
• Drilling commenced at the Cronus magmatic copper-gold sulphide target before moving to the Crius copper,
gold, PGE reef.
• Next, the drill rig will move to the Hyperion copper, gold, PGE reef, where the field team have identified a new
gossan near planned drilling. This will be followed by the Oceanus copper, gold, PGE reef.
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 08 Apr
Short Term Trading Week Starting: 08 Apr, page-12
Featured News
Featured News
The Watchlist
PAR
PARADIGM BIOPHARMACEUTICALS LIMITED..
Paul Rennie, MD & Founder
Paul Rennie
MD & Founder
SPONSORED BY The Market Online