IRC - LATEST DRILL RESULTS FROM TEAL GOLD PROJECT DELIVER SPECTACULAR RESULTS HIGHLIGHTS:
4m composite sampling from reverse circulation Resource definition drilling1 at the Teal gold project return highly encouraging results
Best preliminary downhole intercepts from within and below the Teal Stage 1 pit design include:
32m @ 24.05g/t Au from 32m (including 4m @ 194.78g/t Au from 44m) – TRC1608
36m @ 2.02g/t Au from 36m (including 24m @ 2.80g/t Au from 40m) – TRC1605
52m @ 2.36g/t Au from 64m (including 12m @ 4.26g/t Au from 64m) – TRC1609
4m @ 7.50g/t Au from 40m – TRC1603
24m @ 2.85g/t Au from 52m (including 4m @ 9.14g/t Au from 72m) – TRC1603
An updated mine optimisation study and economic model is expected in the June Quarter using updated pricing and cost parameters
“These excellent drill results are pleasing to see as it confirms mineralisation geometry and grade across the entire strike length of the deposit to underpin the Stage 1 mine development.
The drilling also indicates the potential at depth immediately below the oxide and transitional zone which will be assessed for mining and processing once the upcoming metallurgical testwork is completed in the June Quarter,” Managing Director Jon Price said.
------------------------------------
Cheers tela
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 11 Apr
Short Term Trading Week Starting: 11 Apr, page-173
-
- There are more pages in this discussion • 484 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, Chief Executive Officer
Paul Long
Chief Executive Officer
SPONSORED BY The Market Online