DTR:
Colosseum Delivers More High Grade Gold Intercepts
Highlights
• Results received from diamond and reverse circulation (RC) drilling within
the south pit, comprising infill and extensional drilling
• Final results from diamond drillhole CM24-16 received, increasing the
intercept from 88m to 104.7m:
o 104.7m @ 3.65g/t Au from 77.23m
Incl. 12.2m @ 8.40g/t Au from 108.81m
o 12.8m @ 2.18g/t Au from 208.17m
• First results from the RC program have been received, with the following
significant results:
o RC24-003 25.9m @ 1.91g/t Au from 57.91m
Incl. 3.05m @ 3.05g/t Au from 57.91m
o RC24-004 3.05m @ 1.92g/t Au from 86.86m
3.05m @ 2.95g/t Au from 94.48m
o RC24-008 74.7m @ 4.27g/t Au from 77.72m
Incl. 27.4m @ 7.82g/t Au from 88.39m
• Updated Mineral Resource Estimate (MRE) underway, with an expected
release in early June to be followed by mining studies
Dateline Resources Limited (Dateline or the Company) is pleased to announce
further significant gold values from drilling results at the Colosseum Gold Mine in
California. The Company currently has a diamond and RC rig operating in the south
pit undertaking infill and extensional drilling.
Diamond drillhole CM24-16 was first reported in April 2024, with assays returned
for the upper portion of the hole (88m @ 4.18g/t Au). The hole was extended to
ensure that it finished outside of the sedimentary breccia, with recent assays
extending the intersection to 104.7m @ 3.65g/t Au.
The RC drill rig is focused on infill drilling and testing the margins of the existing
Mineral Resource. Significant results received to date include 74.7m @ 4.27g/t Au
and 25.9m @ 1.92g/t Au.
The Mineral Resource update is currently underway. Results from CM24-16 will be
included in this update, however the RC results will be included in a subsequent
update later in the year.
Commenting on the study, Managing Director, Stephen Baghdadi, stated:
“These drill hole results are further confirmation that the Colosseum project has
delivered consistent gold grades in a wide zone.
“With the updated MRE expected in the next few weeks, we plan to move quickly
to determining a mine plan to extract value for our shareholders.”
For more info. refer to todays ann.
glall
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 13 May
DTR:Colosseum Delivers More High Grade Gold...
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)