News can't be too far off imo... + 6 Mill cash Downhole...

  1. 1,036 Posts.
    lightbulb Created with Sketch. 165
    News can't be too far off imo...wink.png + 6 Mill cash

     Downhole geophysical survey of the Horden Lake deposit, to be completed in
    January 2024.
    o EM method to target massive sulphide bodies that sit outside the currently
    defined mineralised envelope, both at depth and along strike.
    o Technique not used by prior operators, despite clear suitability.
    o Results expected in time to support drill targeting

    Catalysts and Work Program
    The Company has commenced an extensive work program on its Canadian Cu-Ni-PGM projects, with the majority
    of focus on its 100% owned Horden Lake project, which already hosts a 28mt at 1.5% CuEq inferred and indicated
    resource1.

    Key catalysts over the next 2-3 quarters are as follows:
     8,000m diamond drilling on Horden Lake, targeting grade and tonnage upside.
     Downhole EM survey at Horden Lake, targeting massive sulphide extensions below open mineralisation.
     Metallurgical testwork to optimise a flowsheet for maximum net smelter return from contained metals.
     Horden Lake resource update.
     Geophysics results from BAGB surveys recently completed, and ongoing interpretation and targeting.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.