AVL - Signs First CellCube Vanadium Battery Sale in Western Australia
Highlights:
- AVL’s 100% owned subsidiary, VSUN Pty Ltd, concludes its first CellCube sale. The sale and installation will be the first commercial vanadium flow battery to be commissioned in Western Australia.
- The GILDEMEISTER CellCube FB 10-100 is to be installed at a Busselton agricultural property as part of a 15kW solar PV installation.
- The CellCube order is being filled at the GILDEMEISTER facility in Vienna. Once prepared, it will be shipped to Fremantle for road transport to the Busselton site.
- The CellCube is able to deliver up to 10kW of power and has a storage capacity of 100kWh. This can provide up to 10 hours of renewable power to the site, supplied by charging from the solar PV system.
- The CellCube will provide 3-phase power to the site which currently has only a single phase power connection to the grid.
- Our client is expecting to be up to 90% self-sufficient for their power needs, but will remain connected to the grid.
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 16 May
Short Term Trading Week Starting: 16 May, page-322
-
- There are more pages in this discussion • 295 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)