PUN -
Pegasus hits high-grade copper-silver-zinc massive sulphides at Mt Mulcahy Project
Ongoing diamond drilling program to focus on outlining mineralisation at South Limb Pod deposit
___________________________________________________________
HIGHLIGHTS
? Initial diamond drilling at the South Limb Pod deposit within the Mt Mulcahy Project in WA intersects high-grade copper with silver and zinc in massive sulphides
? Diamond drill hole MMSP004 intersected 4.30m @ 4.48% Cu, 2.88% Zn and 38.1ppm Ag (true thickness)
? Historic diamond drilling intersected 6.80m @ 4.86% Cu and 3.67% Zn (true thickness) from 112.20m.
? Numerous drill targets identified by geophysics including VTEM surveys
- Forums
- ASX - Short Term Trading
- short term trading - week starting 16th sept
PUN - Pegasus hits high-grade copper-silver-zinc massive...
Featured News
Featured News
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Matthew Kowal / Andy Burger, CCO / Head of E-Commerce
Matthew Kowal / Andy Burger
CCO / Head of E-Commerce
SPONSORED BY The Market Online