STTCOMP CZL FA LONG
MKT CAP 14 MILL
CASH 3MILL+
MINERAL ZINC
SP 5c
CAPITAL STRUCTURE
Shares on Issue 293,857,802
Quoted Options on Issue 68,118,999
Unquoted Options/Performance Rights 7,783,331
Cash, Receivables & Inventory
(31/12/2020) US$3.2M
Debt (31/12/2020) US$0.1M
• Plant refurbishment completed within budget
• First production: Thursday afternoon 14 April 2021
• Zinc and lead concentrate looking good ( awaiting
confirmation by assays)
• Tailings storage facility operating as expected
• Plant commenced operating at 100tpd, production
being ramped up
• Expected Zinc recoveries 75% (Aldama 70%)
• Expected lead recoveries 60% (Aldama 38%) after future
installation of shaking tables
• Constant mine water quality stabilises reagent
consumption and plant performance
• Mill oversized, targeting 200tpd at <63microns, mill
designed for 300tpd
• Installed power 1 MW duty and 1 MW standby to increase
plant availability
• Current production rates average 100 tpd, targeting 250 tpd
• Current stockpiles exceed 3,000t (~US$1.2M NRV), plan to reduce
by end Q2, 2021
• Pumping rates increased to reach target water level depth by
November 2021 maintaining scheduled drawdown
• Mine infrastructure renewed with new pumps ventilation, services,
offices and change house completed
• Purchase of updated key mobile mining equipment in progress
Very under valued imo.
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 19 Apr
Short Term Trading Week Starting: 19 Apr, page-20
-
- There are more pages in this discussion • 129 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O’Donovan, Executive Director
Gerard O’Donovan
Executive Director
SPONSORED BY The Market Online