    STTCOMP CZL FA LONG

    MKT CAP 14 MILL

    CASH 3MILL+

    MINERAL ZINC

    SP 5c

    CAPITAL STRUCTURE

    Shares on Issue 293,857,802
    Quoted Options on Issue 68,118,999
    Unquoted Options/Performance Rights 7,783,331
    Cash, Receivables & Inventory
    (31/12/2020) US$3.2M
    Debt (31/12/2020) US$0.1M

    • Plant refurbishment completed within budget
    • First production: Thursday afternoon 14 April 2021
    • Zinc and lead concentrate looking good ( awaiting
    confirmation by assays)
    • Tailings storage facility operating as expected
    • Plant commenced operating at 100tpd, production
    being ramped up
    • Expected Zinc recoveries 75% (Aldama 70%)
    • Expected lead recoveries 60% (Aldama 38%) after future
    installation of shaking tables
    • Constant mine water quality stabilises reagent
    consumption and plant performance
    • Mill oversized, targeting 200tpd at <63microns, mill
    designed for 300tpd
    • Installed power 1 MW duty and 1 MW standby to increase
    plant availability
    • Current production rates average 100 tpd, targeting 250 tpd
    • Current stockpiles exceed 3,000t (~US$1.2M NRV), plan to reduce
    by end Q2, 2021
    • Pumping rates increased to reach target water level depth by
    November 2021 maintaining scheduled drawdown
    • Mine infrastructure renewed with new pumps ventilation, services,
    offices and change house completed
    • Purchase of updated key mobile mining equipment in progress

    Very under valued imo.
 