VTX is still flying under the radar big time. So much happening behind the scene...
Benefits of the new plant include:
1. To re install a refurbished circa 110ktpa Gekko Gravity Gold plant in 2024
2. To commence gold production from existing stockpiles in early 2025
3. To commence mining development in the high-grade Reward Mine in late
2024
4. To commence at a reduced throughput, but with ore sorting and ramp up
5. To be Australia’s most prominent high grade gold miner
6. To drill and add high grade gold to the global Hill End gold inventory, from the
large-scale gold system/s within the Hill End Corridor.
7. To take the existing resources and near surface mineralisation to production
utilising gravity gold recovery methods.
8. Earn a robust Safety, Environmental, Social and Governance (ESG) reputation.
9. Build shareholder value
- Forums
- ASX - Short Term Trading
- Short Term Trading Week Starting: 19 Aug
Short Term Trading Week Starting: 19 Aug, page-10
-
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)