I should clarify that MEP will begin to pay back their cost for Jericho out of profit once production reaches positive cash flow. If it doesn’t get to production MEP are absolved of their debt.
- Forums
- ASX - Short Term Trading
- XAO
- Short Term Trading Week Starting: 19 August
Short Term Trading Week Starting: 19 August, page-12
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XAO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8,289.2 |
Change
45.900(0.56%) |
Mkt cap ! n/a |
Open | High | Low |
8,243.3 | 8,291.3 | 8,243.3 |
Featured News
XAO (ASX) Chart |