Short Term Trading Week Starting: 1st Aug, page-377

  1. 7,746 Posts.
    lightbulb Created with Sketch. 156
    CAV SP at 1.4c

    $1.4 mill in the kitty

    Lake Roe Project Priority Targets ( Next to BRB MC 23 mill )

    Field inspection, programme design and drilling approvals are planned to be completed during the next month with initial geochemical aircore drilling anticipated to commence during September

    2 to 2.4c by September
    Last edited by mouse: 03/08/16
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.