Short Term Trading Week Starting 22 May, page-6

  1. 6,098 Posts.
    lightbulb Created with Sketch. 296
    ZEUS Announcement. Smack bang between Delta and Voltaic in Gascoyne.
    24 May 2023
    PHASE 1 MAIDEN DRILLING PROGRAM
    AT MORTIMER HILLS PROJECT TO TEST LITHIUM TARGETS
    HIGHLIGHTS
    Program-of-Work (PoW) was approved for the Phase 1 drill program at Mortimer Hills Lithium
    Project, Gascoyne Region, Western Australia.
    • A large number of outcropping pegmatites have now been identified and confirmed in the
    Pegmatite Creek Prospect area of the Mortimer Hills Project.
    • An initial drilling program for about 1,700m is now planned for early June and will concentrate
    on drilling directly into the mapped pegmatites from surface. The pegmatites are centrally
    located in E09/2147 and are found similarly across the granite greenstone contact along the strike
    from the Yinnietharra Lithium Project (https://deltalithium.com.au/our-projects/yinnetharralithium/) developed by Delta Lithium Limited (ASX: DLI) to the northwest.
    • The drilling service provider has been confirmed. The Aboriginal Heritage Desktop Assessment
    of the Mortimer Hills Project has been finalised.
    • Drilling targets are within “Volta Corridor” (Figure 1) – a major lithium-bearing pegmatite belt in
    which DLI is developing and enlarging the Yinnietharra Lithium Project on our neighbouring
    tenement.
    • A Program of Work (PoW) for Phase 2 drilling has also been lodged to cover follow-up drilling on
    the interpreted extent of the prospective lithium ground on E09/2147, closer to the growing DLI’s
    Yinnietharra Lithium Project.
    Zeus Resources Ltd (ASX: ZEU) (“Zeus” or “the Company”) is pleased to announce that the Compa
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.