STTCOMP E2E TA LONGSP---.005MC---3.84SOI---769+MCASH---In debt,...

  1. 1,699 Posts.
    lightbulb Created with Sketch. 49
    STTCOMP E2E TA LONG
    SP---.005
    MC---3.84
    SOI---769+M
    CASH---In debt, but manageable (according to management)

    Drilling Update - GOVT KAEHNE #9-29 Well (28/11/19)

    Highlights:

     CapStar Rig #311 reached TD of 6,460 feet on Nov 27th at 8:00 am (US MST), two days ahead of
    schedule
     The Muddy (Secondary) formation was intersected at 6,056 MD feet with good oil and gas shows
     The Dakota (Target) formation was intersected at 6,279 MD feet with strong oil and gas shows
     Open hole logging and drill stem testing will be carried out over the next 48 hours

    Refer to todays ann for more info

  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.