short term trading - week starting 26th august, page-10

  1. 12,525 Posts.
    lightbulb Created with Sketch. 1
    Drilling for DRK starts in 3 weeks targeting a large structural plate, one of the biggest ever drilled in the area, measuring 1.5km x 750m.

    Big copper-zinc plate - sounds hard to miss.

    Plates sound a lot easier to hit than pipes or veins.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.