Drilling for DRK starts in 3 weeks targeting a large structural plate, one of the biggest ever drilled in the area, measuring 1.5km x 750m.
Big copper-zinc plate - sounds hard to miss.
Plates sound a lot easier to hit than pipes or veins.
- Forums
- ASX - Short Term Trading
- short term trading - week starting 26th august
Drilling for DRK starts in 3 weeks targeting a large structural...
-
-
- There are more pages in this discussion • 88 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)