SEG 9 October 2017 HIGH GRADE LITHIUM RESULTS AND SPODUMENE...

  1. 24,192 Posts.
    lightbulb Created with Sketch. 5566
    SEG

    9 October 2017

    HIGH GRADE LITHIUM RESULTS AND SPODUMENE CONFIRMED
    AT THE MALINDA LITHIUM PROJECT

    HIGHLIGHTS:
     XRD analysis has confirmed the presence of spodumene in several high‐grade lithium samples.
     Highest grade lithium and tantalum drill intersections at Malinda Project including:
     GASRC0016: 2m @ 1.71% Li2O from 118m including 1m @ 2.01% Li2O from 119m;
     GASRC0011: 4m @ 1.42% Li2O from 0m including 1m @ 2.00% Li2O from 1m;
     GASRC0009: 2m @ 1.49% Li2O from 106m and 7m @ 122ppm Ta2O5 from 101m; and
     GASRC0007: 23m @ 0.98% Li2O from 0m including 5m @ 1.35% Li2O from 0m and
    3m @ 1.22% Li2O from 20m.
     Next round of drilling to commence in November which will systematically step out from current
    intersections to begin work towards a maiden resource estimate.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.