Not sure if this this qualifys but SPQ currently has a Zinc JV...

  1. 2,062 Posts.
    Not sure if this this qualifys but

    SPQ currently has a Zinc JV with Teck Australia

    http://hotcopper.com.au/threads/ann...farm-in-and-jva-with-teck-australia.2631462/#.

    Mc $3.3 million @ 1.2 cents
    Cash $400k


    "Previous drilling by Superior of the Walford South Prospect confirmed the presence of substantialamounts of pyritic shale containing elevated zinc, which can be associated with SHMS deposits."

    Teck has started their 2016 exploration program -

    1. -
      - in optional expenditures on or before the 31 December 2018.

    Under the terms of the Agreement, Teck has an exclusive right to earn a 70% interest in the Nicholson


    Project by spending $2,500,000 in accordance with the following structure:


    incurring $250,000 Minimum Expenditure: to be spent on exploration by 30 September 2016;

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.