Todays ann looks encouraging - Market seems to like it
The Adatepe-1 well has completed testing and has flowed at a stabilized rate of 13.5 million cubic feet (382,300m3) per day through a 5/8 inch choke at a flowing pressure of 1,320 psia, from 18.5 metres of perforations in the lower sandstone unit only. The perforations are between 1,173 metres and 1,206 metres A series of flow tests were run through a separator at different choke sizes and two pressure build-up surveys were conducted. No formation water was produced during the tests. The gas has a condensate content about the same as the Gocerler gas (7-8 barrels/million cubic feet). This is a very pleasing new field gas discovery, with high gas deliverability reservoir characteristics - an excellent result for the company.
AYO Price at posting:
0.0¢ Sentiment: None Disclosure: Not Held
As of 12:00PM AEST HotCopper has been experiencing service interruptions with the cloud platform that the system is hosted on. As a result, we are experiencing intermittent performance and stability issues. We will resolve these issues as soon as possible but it is dependent on when our cloud platform services are fully restored. We apologize for any inconvenience this is causing you in using HotCopper today.