For those interested,the results for 4 holes at kisi are on the TPJ site.
2 holes for kisi south are pending.
A pretty good result for initial shallow drilling. Will need to go deeper though as kisi south was only drilled to 212m and north only to 100m.
The last 3 holes being drilled at Arie are currently being finished.
Plenty more holes to be drilled at Manus and they should come up with the goodies.
Scorp
Add to My Watchlist
What is My Watchlist?