re: do not worry found it The total mineral resource estimated for the Dikulushi deposit is 1.94 million tonnes at an average grade of 8.59% Cu and 266 g/t Ag (at a 2.0% Cu cut-off and using a 97.5 percentile topcut), equivalent to 167,000 tonnes of contained copper and 517 tonnes (16.6 million ounces) of contained silver.
The larger portion of the mineral resource is classified as measured and indicated, reflecting the good geological continuity of the mineralisation and the adequacy of the drill testing. The table below details these mineral resource estimates.
- Forums
- ASX - By Stock
- silver crashes through to 5 yr highs
re: do not worry found it The total mineral resource estimated...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online