Updated Silver companies comparison spreadsheet as at 1:30pm today. I have included the Maronan starter zone for comparison against the entire project. The starter zone should have around a 6yr mine life but I expect the silver grades to increase as they drill the area out.
Only 20% of the starter zone is in the indicated category. Maronans entire project grades are effected by the copper/gold resource at current prices. I assume they will start mining this once the project has been paid back as it lowers the overall project grades by $47/t or 14%. The lead/silver resource (32.1M/t @ 107 g/t silver & 6.1% lead) encapsulates the copper/gold resource (32.5M/t @ 0.84% cu & 0.64 g/t gold). The Maronan resource is 1000mtr (l) x 600mtr (w) x 1400mtr (d) and open at depth. The grades are increasing at depth and it is presumed that Cannington type grades lie at lower levels.
- Forums
- Commodities
- SILVER
- Silver Stocks ... TSX -ASX
Silver Stocks ... TSX -ASX, page-10
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SILVER (COMEX) to my watchlist
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online