Updated Silver companies comparison spreadsheet as at 1:30pm today. I have included the Maronan starter zone for comparison against the entire project. The starter zone should have around a 6yr mine life but I expect the silver grades to increase as they drill the area out.
Only 20% of the starter zone is in the indicated category. Maronans entire project grades are effected by the copper/gold resource at current prices. I assume they will start mining this once the project has been paid back as it lowers the overall project grades by $47/t or 14%. The lead/silver resource (32.1M/t @ 107 g/t silver & 6.1% lead) encapsulates the copper/gold resource (32.5M/t @ 0.84% cu & 0.64 g/t gold). The Maronan resource is 1000mtr (l) x 600mtr (w) x 1400mtr (d) and open at depth. The grades are increasing at depth and it is presumed that Cannington type grades lie at lower levels.
Updated Silver companies comparison spreadsheet as at 1:30pm...
Add to My Watchlist
What is My Watchlist?