Aerial shot of Sinujif-1.
From RRS announcement http://www.asx.com.au/asxpdf/20051202/pdf/3tl00xmh7ss7q.pdf>
The Nogal-1 well was spudded on 16th November, 1989 and reached TD (Total Depth) of 3,272 .3 metres on 3rd April, 1990. Conoco then went on to drill the Kalis-1 well. The third well in the programme, Sinujif-1, had site preparations and roadwork’s completed at the time that drilling was abandoned in 1991.
cheers
Marny