Yes that is their issue.
Electrostatic separation needs the machines and mineral temperature above 70c to work.
Need the runtime and reasonable feed rate get the msp up to temp and settled.
Ilmenite the easiest of the 3 products to get on spec. but Chemours minimum shipment size abt 7kt
that would require abt 2 months worth of hmc at current wcp production rate
Premium zircon they would ship in either bulk bags or loose in lined shipping containers.
Typical consignment 200t to 300t....maybe hear something on this first if they can meet the iron spec.
Last quarter wcp production numbers in table below
1) not getting the throughput .... mining issue?
2) not getting recovery at wcp .....
kcf
- Forums
- ASX - By Stock
- Sixth Shipment
Yes that is their issue.Electrostatic separation needs the...
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online