AEV 7.69% 1.2¢ avenira limited

AD has also stated in BRR 16 June 2008 that drilling up the...

  1. 3,851 Posts.
    lightbulb Created with Sketch. 68
    AD has also stated in BRR 16 June 2008 that drilling up the lower phosphorite unit in the Main Zone (this lower unit has not previously had a resource calculated) will if all goes well result in MORE RESOURCES IN THE SAME AREA WITH CONSEQUENTLY A REDUCED STRIPPING RATIO AND LOWER OPERATING COSTS.

    The Main Zone resource is only calculated in the upper phosphorite unit and excludes the lower unit as there are insufficient historic drill holes that are deep enough.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.001(7.69%)
Mkt cap ! $35.15M
Open High Low Value Volume
1.3¢ 1.3¢ 1.2¢ $66.07K 5.489M

Buyers (Bids)

No. Vol. Price($)
6 2133545 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 136734 2
View Market Depth
Last trade - 11.39am 05/09/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.