thank for the reply phil,
"8m at 30.0% and 2m at 29.9%.They are 1500m apart.
DSO is at 28% plus.
If we have 1yr plus DSO this can be quickly mined while
building the road (20km) and benefication plant
for Arruwurra"
Didn't know about those results at Wonarah, wow. I was thinking the dso ore maybe found at arruwurra. You are spot on, how good would that be dso right beside the highway(or fairly close). don't need a big area for 1 years worth.
thanks again much appreciated.
- Forums
- ASX - By Stock
- sky news
thank for the reply phil,"8m at 30.0% and 2m at 29.9%.They are...
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable