AEV 0.00% 0.9¢ avenira limited

sky news, page-24

  1. 1,517 Posts.
    champ

    If we can mine DSO at the main zone with overburden of
    approx 25m the removal cost is inexpensive and faster to do
    than the road/benefication plant for arruwurra which
    can be done simultaneously while we mine the DSO.

    For an ore area of say 1500m by 300m would require a
    pit no larger than 1600m by 400 m.It costs approx. $1.50
    per m3 to remove overburden so this is
    1600 x 400 x 25 x 1.50 = $24m
    Assuming 5m average ore depth then ore tonnage is
    1500 x 300 x 5 x 2(density) = 4.5 mt (1.5 years worth)
    or at $400/t =$1,800m revenue. Overburden removal cost is $5.33/t of shipped ore.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $24.33M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $227 25.21K

Buyers (Bids)

No. Vol. Price($)
6 5311925 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 353886 3
View Market Depth
Last trade - 09.59am 31/10/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.