BSX 0.00% 2.8¢ blackstone minerals limited

The concentrator and the mining is probably the easiest part of...

  1. 360 Posts.
    lightbulb Created with Sketch. 68
    The concentrator and the mining is probably the easiest part of this project, and the least time constraint. The latter part, producing nickel sulphate from MHP is also well understood (that is where EcoproBM come in). It is the part in the middle, the hydromet plant, cutting out the need for producing concentrate and putting it through the smelter that is challenging. So, I think the answer to your question is no.


 
watchlist Created with Sketch. Add BSX (ASX) to my watchlist
(20min delay)
Last
2.8¢
Change
0.000(0.00%)
Mkt cap ! $14.86M
Open High Low Value Volume
3.0¢ 3.0¢ 2.8¢ $7.417K 255.2K

Buyers (Bids)

No. Vol. Price($)
1 19331 2.8¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 50000 1
View Market Depth
Last trade - 15.59pm 15/11/2024 (20 minute delay) ?
BSX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.