RMX 0.00% 0.1¢ red mountain mining limited

slightly different spin, page-89

  1. 7,400 Posts.
    lightbulb Created with Sketch. 360
    It would make sense that the scoping study would be delayed a bit to incorporate new drill results and any subsequent resource upgrade however they have stated that the scoping study will be based on the existing resource and anything from current drilling would be a bonus. And if they are releasing all the drill results in one bunch, why did they release the initial couple of drill results.

    Hopefully they still get time to complete Stage 2 drilling before the end of June as planned.
 
watchlist Created with Sketch. Add RMX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.