"We have access to a wide network of feedstock sources. All the commissioning feedstock has been secured and is in transit to site".
So the stuff is in transit, still. Sigh. If I got it right, Terry was talking about hot commissioning in March only, no word on first production during March. IMO this is a shift in wording that foreshadows a (minor) delay. His projections of 1/3 capacity in 2013 and 1/2 in 2014 collide with what the slides of the 07/02 presentation said (950/2000). Anyway, a good show today. Keeping my fingers crossed.
"We have access to a wide network of feedstock sources. All the...
Add to My Watchlist
What is My Watchlist?