NWE 0.00% 5.6¢ norwest energy nl

slow frack clean up, page-2

  1. 91 Posts.
    lightbulb Created with Sketch. 10
    Hi TBE

    As found on the internet, the return of the facking fluids can take several months, and thats on a fully producing well, 1km horizontal.
    So our test well would obviously take alot longer to fully clean up, but not shure if thats what they need for a sucsesful test.
    In any case the flow rate achieved would be X 20 at least for one fully producing well. ( 1KM horizontal)
 
watchlist Created with Sketch. Add NWE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.