AEV 9.09% 1.0¢ avenira limited

I know this topic was discussed a few weeks ago, but it was left...

  1. 675 Posts.
    I know this topic was discussed a few weeks ago, but it was left a little unresolved and was followed up with a few calls to AD (I think that was YC).

    If they can have a cashflow of 1 billion, then surely they could build a slurry pipe and move more than 2-3mtpa???

    What would piping cost and how much more could you move with a pipe than a truck? Anyone with ideas on the efficiencies
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.