Should get a lightning #2 result sometime next week 30 days will be Thursday 9th January let’s hope they have done substantial logging and testing before they announce the result ... would be good to see a higher portion of liquids and of this a higher proportion of crude rather than NGL ....
Either way the 15% increase in crude prices can’t of been bad for the bottom line even with the SM71 field shut in and lightning#1 shut in for a period ....
- Forums
- ASX - By Stock
- SM71 Production data
Should get a lightning #2 result sometime next week 30 days will...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
-0.001(7.69%) |
Mkt cap ! $57.54M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $4.714K | 392.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 7391126 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 18351847 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 7143961 | 0.012 |
9 | 7876361 | 0.011 |
6 | 14157452 | 0.010 |
2 | 1375122 | 0.008 |
2 | 166837 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 15468729 | 13 |
0.014 | 4999235 | 10 |
0.015 | 4127000 | 5 |
0.016 | 2000000 | 1 |
0.017 | 72000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |