SMN 2.13% 48.0¢ structural monitoring systems plc

Whats a realistic timeline for approval. They need feedback,...

  1. 2,151 Posts.
    lightbulb Created with Sketch. 74
    Whats a realistic timeline for approval. They need feedback, company to reply, then it needs to be ok'd by the Aircraft Certification Office (ACO) then a conformity inspection needs to be undertaken. This is all deduced from the link below ...

    https://www.aviationpros.com/engines-components/aircraft-airframe-accessories/article/11150520/the-complexity-of-pma-and-stc-approvals

    Also says that it take 9 months-1 year for a STC approval (back in 2013) so if we only just formally submitted to the FAA does than mean xmas - Q3 21?!

    Apologies if this has been repeated on other threads.
 
watchlist Created with Sketch. Add SMN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.