I agree that they may be slower than that, and I reckon that Ive pigeon holed myself with the idea of bringing on eagle downs asap. Taking the ROM production numbers from the og aquila dfs, it seems like the latent capacity at poitrel mill is too small, and any other option involves trucking from ed to issac mill as well, and also shutting down mavis downs contribution to get it to fit.. I figure the current low margin tonnes at Poitrel should be supplemented by HCC/SHCC from ED HCU seam, with lower cost from a full and expanded mill, but the Capex may be beyond their reach with current prices.
The last time the PCI discount was this low was a 6 month period in 2018, i think.
- Forums
- ASX - By Stock
- SMR
- SMR Capex to OCF
SMR Capex to OCF, page-3
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SMR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.35 |
Change
0.000(0.00%) |
Mkt cap ! $3.019B |
Open | High | Low | Value | Volume |
$3.38 | $3.40 | $3.33 | $2.193M | 652.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 14000 | $3.34 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.36 | 8932 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 14000 | 3.340 |
3 | 13676 | 3.330 |
5 | 12097 | 3.320 |
2 | 6146 | 3.310 |
4 | 4614 | 3.300 |
Price($) | Vol. | No. |
---|---|---|
3.360 | 4924 | 1 |
3.370 | 9097 | 4 |
3.380 | 6146 | 2 |
3.390 | 1222 | 1 |
3.400 | 1222 | 1 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
$3.35 |
  |
Change
0.000 ( 0.51 %) |
|||
Open | High | Low | Volume | ||
$3.39 | $3.40 | $3.33 | 170803 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
SMR (ASX) Chart |