The drilling rig has been rigged down and will be moved
to the Snatcher-2 drill site, 899 metres to the northwest of the Snatcher-1 oil well following the
completion of the setting of the surface conductor at Snatcher-2.
? How long will this take.
Add to My Watchlist
What is My Watchlist?