FAR 1.02% 49.5¢ far limited

SNE-2: rig arrival

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Brief update:

    Top hole section was completed at SNE-3 yesterday and the Topaz mobilised to SNE-2 location at about 7PM. Drillship Athena joined it later on. Look fwd to an update on the depth the casing was run & set at. (At SNE-1 13" csg for the tophole was at apprx 1907mTVD).

    Attached is a map showing the path of Athena's mobilisation apprx 6.2kms north from SNE-3. Timeframe should b under 6 days for the tophole section dressage, before they drill on. Safe drilling.



 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
49.5¢
Change
0.005(1.02%)
Mkt cap ! $45.74M
Open High Low Value Volume
49.0¢ 49.5¢ 49.0¢ $4.017K 8.162K

Buyers (Bids)

No. Vol. Price($)
1 19637 49.0¢
 

Sellers (Offers)

Price($) Vol. No.
50.5¢ 10000 1
View Market Depth
Last trade - 13.40pm 26/07/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.